Development Status of the NEXT Propellant Management System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2007
2007
2024
2024

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 16 publications
(11 citation statements)
references
References 3 publications
0
11
0
Order By: Relevance
“…6 All assemblies have completed functional testing, and both flight-like HPA and LPA assemblies have successfully completed qualification-level vibration testing (14.10 G rms through each of the 3 axes for 2 min duration) (ref. 13) and thermal vacuum testing (four thermal cycles from 12 to 70 °C). The assemblies have been delivered to GRC and are being prepared for system integration testing.…”
Section: Propellant Management Systemmentioning
confidence: 99%
“…6 All assemblies have completed functional testing, and both flight-like HPA and LPA assemblies have successfully completed qualification-level vibration testing (14.10 G rms through each of the 3 axes for 2 min duration) (ref. 13) and thermal vacuum testing (four thermal cycles from 12 to 70 °C). The assemblies have been delivered to GRC and are being prepared for system integration testing.…”
Section: Propellant Management Systemmentioning
confidence: 99%
“…The EM Propellant Management System (PMS) was manufactured by Aerojet [26]. The PMS delivers low pressure gas to the thruster from a supercritical xenon supply source, and it consists of a High Pressure Assembly (HPA) and a Low Pressure Assembly (LPA).…”
Section: Propellant Management Systemmentioning
confidence: 99%
“…11 Flow rate was controlled using variable, electro-mechanical pressure regulators and thermal throttles. 22 During thruster operation, voltages and currents were measured with digital multimeters and shunts. These measured parameters were used to set thruster operating conditions, as well as to determine thruster performance.…”
Section: Test Support Hardware and Operating Conditionsmentioning
confidence: 99%