2013
DOI: 10.1109/tpwrs.2012.2213309
|View full text |Cite
|
Sign up to set email alerts
|

DG allocation for benefit maximization in distribution networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
120
0
7

Year Published

2014
2014
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 268 publications
(127 citation statements)
references
References 25 publications
0
120
0
7
Order By: Relevance
“…For planning purpose, wind speed can be normally regarded following the Weibull distribution, the expression of which can be found in [10].…”
Section: Wind Generationmentioning
confidence: 99%
See 3 more Smart Citations
“…For planning purpose, wind speed can be normally regarded following the Weibull distribution, the expression of which can be found in [10].…”
Section: Wind Generationmentioning
confidence: 99%
“…S g w ), and binary decision for feeder upgrade (i.e. τ ij ), which is same to [8]- [10]. Besides, as DR option is incorporated, the contract design should be considered.…”
Section: Decision Variablesmentioning
confidence: 99%
See 2 more Smart Citations
“…Another study in [70] developed a GA-based multiobjective framework to locate and size DG units to find the best compromise between the network upgrade deferral and the costs related to energy losses, unserved energy, and imported energy. In addition, a recent study in [71] proposed a GA-based approach to place and size renewable DG units (i.e., biomass, wind and solar)…”
Section: Network Upgrade Deferralmentioning
confidence: 99%