2014
DOI: 10.1109/tpwrd.2013.2289944
|View full text |Cite
|
Sign up to set email alerts
|

Diagnostics of a Transformer's Active Part With Complementary FRA and VM Measurements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 29 publications
(11 citation statements)
references
References 9 publications
0
11
0
Order By: Relevance
“…Other results used in this paper for verification of proposed new method come from the industry: comparison of sister units (the same type, with possible differences in constructional details) and influence of a tap changer position on FRA curves. Author's experiences show that it is possible to introduce the new method of results assessment, based on simultaneous analysis of data coming from E2E and IntCap test setups [3,[11][12][13].…”
Section: Fra Measurements and Results Interpretationmentioning
confidence: 99%
See 1 more Smart Citation
“…Other results used in this paper for verification of proposed new method come from the industry: comparison of sister units (the same type, with possible differences in constructional details) and influence of a tap changer position on FRA curves. Author's experiences show that it is possible to introduce the new method of results assessment, based on simultaneous analysis of data coming from E2E and IntCap test setups [3,[11][12][13].…”
Section: Fra Measurements and Results Interpretationmentioning
confidence: 99%
“…A transformer with deformed winding could still be operated under nominal conditions, however during subsequent network event, it may lead to transformer internal short circuit with a risk of transformer fire and all costs related to power outage and unit's repairs or replacement. Thus, early and reliable diagnostics is a key factor in modern management of power systems assets [1][2][3][4][5].…”
Section: Introductionmentioning
confidence: 99%
“…The influence of magnetostriction had been reduced by application of Spectral Substraction Method (V SSM). The application of FRA and V-SSM measurements may give detailed information of the mechanical condition of transformer's active part [6,7].…”
Section: Discussionmentioning
confidence: 99%
“…Group I contains basic tests, such as inspection of accessories, on-load tap changer, and overall external examination. In group II, operational tests of the active part of the transformer are taken into account, which include insulation and winding resistance measurements, oil diagnostics (breakdown voltage and DGA) as well as combined sweep frequency response analysis (SFRA) and mechanical vibration (VM) measurements [13]. Group III is the basis for planning renovations and forecasting the further life of the unit.…”
Section: The Trafograde Systemmentioning
confidence: 99%