2015
DOI: 10.1016/j.egypro.2015.12.164
|View full text |Cite
|
Sign up to set email alerts
|

Did ARBED I Save Energy in Wales’ Deprived Dwellings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Quality of work [4] and the need for technical knowledge is something that requires further investigation due to the recurring feedback provided during case study two stakeholder interviews. The risk in this instance is that there is a case of large mitigation costs following completion of such projects, resulting in a reduction of occupant quality of life, but also the result of poor project management [ibid].…”
Section: Case Study Two Results Overviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Quality of work [4] and the need for technical knowledge is something that requires further investigation due to the recurring feedback provided during case study two stakeholder interviews. The risk in this instance is that there is a case of large mitigation costs following completion of such projects, resulting in a reduction of occupant quality of life, but also the result of poor project management [ibid].…”
Section: Case Study Two Results Overviewmentioning
confidence: 99%
“…Arbed three commenced in 2018 and will be completed in 2021 [2]. The UK, and in particular Wales has some of the worst and inefficient dwellings from an energy perspective within Europe, resulting in significant fuel poverty and potential impacts upon occupant quality of life [3,4,5]. The operations, stakeholder involvement and management of the three Arbed scheme varies, and so do the processes and procedures of managing such projects, potentially applying to other UK wide or regional government funded retrofit projects.…”
Section: Introductionmentioning
confidence: 99%
“…Hence, the resulting thermal image provides a two-dimensional map of temperature difference over the surface of the object. Thermography is an established technique within the construction industry for checking the continuity of insulation, identifying sources of air leakage, thermal bridging, workmanship, detecting and mapping moisture in a building [22]. The output when using an IR thermal camera is a thermogram, which illustrates hot and cold areas as different colours [23].…”
Section: Building Performance Assessment (Bpa) Protocolin-constructionmentioning
confidence: 99%
“…Since 2010, significant sums of money have been invested to improve energy efficiency and combat fuel poverty in some of the most deprived areas of Wales, by retrofitting thousands of dwellings through the Arbed1, 2 and 3 schemes with exterior wall insulation, roof insulation, new boilers and controls, windows [3,4]. Increasing energy efficiency of older properties remains a significant challenge, which cannot be achieved through insulation and air-tightness interventions alone, particularly when alterations to historically important architectural features of the building are not permitted [5]. So, alternative solutions are needed, which is explored in this paper.…”
Section: Introductionmentioning
confidence: 99%