Discussion. Design and Construction of the Northfleet Hope Container Terminal, Til -Bury Docks.

Abstract: . MILLS M r Page, M r Curtisand M r Mills Regarding the test on the sheet piling, some additional information may be of interest. The loads in four of the tie rods were monitored: two of these rods were instrumented at both quay and anchorage ends and two at the quay ends only.Figs 21 and 22 show that the loads in the quay ends were quite low initially at only 100-200 kN and it was not until the final placing of the 2 m of Thanet sand compacted in 30 cm layers, that the loads increased to 400-500 kN, about two… Show more