2013
DOI: 10.1007/s10669-013-9459-0
|View full text |Cite
|
Sign up to set email alerts
|

Distributed travel time savings of a multiscale transportation access management program

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2013
2013
2021
2021

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 18 publications
(9 citation statements)
references
References 15 publications
0
9
0
Order By: Relevance
“…Xu and Lambert and Xu et al . addressed safety and congestion separately, neglecting to integrate the several perspectives and to treat the uncertainties of underlying data and parameters.…”
Section: Methods Developmentmentioning
confidence: 99%
“…Xu and Lambert and Xu et al . addressed safety and congestion separately, neglecting to integrate the several perspectives and to treat the uncertainties of underlying data and parameters.…”
Section: Methods Developmentmentioning
confidence: 99%
“…It is assumed that preliminary engineering costs (C PE ), right-of-way acquisition costs (C RW ), construction costs (C CN ), and preservation and maintenance costs (C PM ) of access management projects are changing linearly with the length of a corridor segment and all these costs can be summed up as the total costs (C Total ). Details of the cost elicitations are provided in Chapter 3. under consideration for implementation of access management techniques, are evaluated using a cost-benefit analysis adapted from Xu and Lambert (2013a) and .…”
Section: Quantification Of Costsmentioning
confidence: 99%
“…This dissertation summarizes theory, methodology, and application disseminated in the literature Xu and Lambert 2013a) and conference presentations Xu and Lambert, 2013b;Watson et al 2012). Appendix E provides milestones of the research effort demonstrated in this dissertation.…”
Section: Contributionsmentioning
confidence: 99%
See 2 more Smart Citations