2010
DOI: 10.3182/20100701-2-pt-4011.00006
|View full text |Cite
|
Sign up to set email alerts
|

Does portability of IEC 61499 mean that once programmed control software runs everywhere?

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…Fig modelling that The tool chain is used fo verification of Programmable L aid of simulation. It encompa based on active research in the distributed embedded control described in [3,[21][22][23][24][25][26][27]. Howev the tool chain is outside of the discuss here only one of it generator/configurator.…”
Section: Using Controlled Non-determinismmentioning
confidence: 99%
“…Fig modelling that The tool chain is used fo verification of Programmable L aid of simulation. It encompa based on active research in the distributed embedded control described in [3,[21][22][23][24][25][26][27]. Howev the tool chain is outside of the discuss here only one of it generator/configurator.…”
Section: Using Controlled Non-determinismmentioning
confidence: 99%
“…Gerber and Hanisch [18] show that the execution environment can change the execution behavior and added it to their verification models. However, Sünder and Vyatkin [19] show that a full mathematical model of the whole execution environment and the control hardware leads to highly complex models, i.e.…”
Section: Introductionmentioning
confidence: 99%