SPE/IADC Drilling Conference 2013
DOI: 10.2118/163505-ms
|View full text |Cite
|
Sign up to set email alerts
|

Drilling Optimization in Deep Tight Gas Field

Abstract: In the Sultanate of Oman, a high temperature and high pressure deep tight gas exploration field required dedicated drilling optimization to reduce the substantial drilling cost incurred. The initial well delivery was an estimate of 30 days for the 12.25 in. section (~ 2800 m interval) and 55 days for the 8.375 in. section (~ 1800 m interval) reaching a total depth of 5000 m. The 12.25 in. section's challenges were mainly a result of the vast variation of the unconfined compressive strengths (UCS) of the corres… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles