2019
DOI: 10.11113/jt.v81.11452
|View full text |Cite
|
Sign up to set email alerts
|

Ductility of Reinforced Concrete Sub Frame for Industrialized Building System

Abstract: An accurate determination of industrialized building system (IBS) frames ductility under alternating lateral loads is the key issue of this study. The performance features of IBS H frame assembly subjected to cyclic lateral pushover test with six attached IBS components are reported. A test scheme of nonlinear elastic sub-frame system is proposed to build an IBS structural building system. This system complies with the requirements of strength and ductility governed by European Codes 2 and 8. The three models … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 11 publications
0
4
0
Order By: Relevance
“…Ismail (2017) proposed I-CMMS for the maintenance of the IBS building. In 2019, Aljawadi et al (2019), focused their publication on the test scheme of nonlinear elastic sub-frame systems to build an IBS structural building system. Previously, Mohammad et al (2016), highlighted the high investment in the IBS technical and maintenance remained the main obstacles in the implementation of IBS in Malaysia.…”
Section: Applicationmentioning
confidence: 99%
“…Ismail (2017) proposed I-CMMS for the maintenance of the IBS building. In 2019, Aljawadi et al (2019), focused their publication on the test scheme of nonlinear elastic sub-frame systems to build an IBS structural building system. Previously, Mohammad et al (2016), highlighted the high investment in the IBS technical and maintenance remained the main obstacles in the implementation of IBS in Malaysia.…”
Section: Applicationmentioning
confidence: 99%
“…Lack of knowledge and expertise within the area of IBS construction can lead to financial problems pertaining to construction cost (Abas et al, 2014;Kamar et al, 2012;Tamrin et al, 2016;Zakari et al, 2017). To realize the ideal way of utilizing IBS to its maximum advantage is through educating architects and engineers in a systematic way to integrate design, technology, management, economics, as well as marketing (Aljawadi et al, 2019). in their study showed that most of the architects and engineers are still unaware of the basic design process to fabricate, connect, and install the elements of IBS in Malaysia.…”
Section: Knowledge and Expertisementioning
confidence: 99%
“…Process integration: IBS is an integrated process involving all subsystems, components, manufacturing and construction processes, and which all requires efficient management (Jabar et al, 2019). Design, production, and onsite erection are strongly interrelated which can be viewed as part of an integrated process that requires planning and coordination (Aljawadi et al, 2019). Integration processes across the whole project must undergo certain level of assessment in order for contractor to achieve high level of efficiency and synergy between processes as well as to avoid future unnecessary costs.…”
Section: Industrialized Building System (Ibs)mentioning
confidence: 99%