2020
DOI: 10.1109/access.2020.3026839
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic and Static Energy Efficient Scheduling of Task Graphs on Multiprocessors: A Heuristic

Abstract: For energy efficient scheduling of task graphs on multiprocessors, dynamic voltage and frequency scaling (DVFS) and duplication are two widely used techniques. DVFS is generally used to utilize the execution slack by lowering the voltage and frequency of a task to decrease the dynamic energy consumption. Whereas duplication decreases the schedule length and communication energy consumption by replicating certain dependent tasks to avoid communication delays. However, while making decisions on DVFS and duplicat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 33 publications
0
3
0
Order By: Relevance
“…Generally, these schemes are triggered when the temperature approaches a threshold value 6 . Two of the widely used DTM approaches are DVFS and DPM 7 . On the basis of how DVFS and DPM approaches are used, the literature can be classified into two categories: proactive and reactive.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Generally, these schemes are triggered when the temperature approaches a threshold value 6 . Two of the widely used DTM approaches are DVFS and DPM 7 . On the basis of how DVFS and DPM approaches are used, the literature can be classified into two categories: proactive and reactive.…”
Section: Related Workmentioning
confidence: 99%
“…6 Two of the widely used DTM approaches are DVFS and DPM. 7 On the basis of how DVFS and DPM approaches are used, the literature can be classified into two categories: proactive and reactive. The proactive approaches are offline and the decision on voltage/frequencies of the cores is taken before run time.…”
Section: Related Workmentioning
confidence: 99%
“…Therefore, batching the workpieces and making the scheduling scheme in the production of the multi-level structures have practical significance for reducing the completion time. The manufacturing industry has consumed large amounts of energy in the process of transforming resources into products or services, leading to many environmental problems [4]. The realization of low-carbon manufacturing is extremely important for improving the sustainability of the manufacturing industry [5].…”
Section: Introductionmentioning
confidence: 99%