2019
DOI: 10.35940/ijeat.f9241.088619
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Consolidation of VM Allocation and VM Migration to Optimize Energy Consumption of Cloud Data Centers

Abstract: Including the expanding fame of the cloud model and quick multiplication of cloud frameworks there are expanding concerns about energy utilization and subsequent effect of cloud as a supporter of worldwide CO2 discharges. Until now, little is thought about how to fuse energy utilization and CO2 worries into cloud application. Energy consumption has become an important cost factor for computing resources. In this research article, we proposed an algorithm to VM Allocation and VM migrations in the context of pow… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 21 publications
(22 reference statements)
0
0
0
Order By: Relevance
“…This led to an increased probability for project completion on or before the scheduled time. Kumar et al [7], in a comparative study of time-cost optimization studied the CPM & PERT methods as suitable tools to analyze and reduce project duration. They opined that a reduction in project duration leads to increase in direct cost of the project but that the indirect cost of the project, which is as a result of a compromise between the time and cost of the project, reduces.…”
Section: Introductionmentioning
confidence: 99%
“…This led to an increased probability for project completion on or before the scheduled time. Kumar et al [7], in a comparative study of time-cost optimization studied the CPM & PERT methods as suitable tools to analyze and reduce project duration. They opined that a reduction in project duration leads to increase in direct cost of the project but that the indirect cost of the project, which is as a result of a compromise between the time and cost of the project, reduces.…”
Section: Introductionmentioning
confidence: 99%