2007
DOI: 10.1007/s00170-006-0836-4
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
47
0

Year Published

2010
2010
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 59 publications
(48 citation statements)
references
References 13 publications
1
47
0
Order By: Relevance
“…From the machine queue, the job assigned by lowest preference value is taken up for work. Sridharan [30]). This rule chooses the job that has the lowest value of the sum of setup time and processing time.…”
Section: Job Scheduling Decision Rulesmentioning
confidence: 99%
“…From the machine queue, the job assigned by lowest preference value is taken up for work. Sridharan [30]). This rule chooses the job that has the lowest value of the sum of setup time and processing time.…”
Section: Job Scheduling Decision Rulesmentioning
confidence: 99%
“…In turn, the mean flow time was minimized with job of the smallest critical ratio (JCR) rule (Kim and Bobrowski 1994), SIMSET (Kim and Bobrowski 1994) or the shortest setup + processing time (SSPT) rule (Vinod and Sridharan 2008). Similarly, the best effect on mean tardiness was registered in the case of JCR (Kim and Bobrowski 1994) and SSPT (Vinod and Sridharan 2008) rule. The JCR and SSPT are both combined rules.…”
Section: Scheduling Methodsmentioning
confidence: 99%
“…Combined rules also proved to outperform simple rules in researches that had not considered sequence-dependent setups (Dominic et al 2004). The popular shortest processing time (SPT) rule is also worth consideration because, despite its simplicity, it has produced some good results in some research (Dominic et al 2004;Holthaus and Rajendrant 1997;Vinod Sridharan 2008).…”
Section: Scheduling Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…One method to increase the production of an industry is to create proper scheduling for the components on the available machines so that the order will complete on time, maximizing the use of the resources and minimizing the average waiting time [2]. Scheduling exists in most manufacturing and production systems, as well as in most information-processing environments.…”
Section: Introductionmentioning
confidence: 99%