2012
DOI: 10.1108/03684921211257694
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic suppliers' risk management of large‐scale and complex equipment development

Abstract: Purpose -The paper attempts to establish a two-dimension frame to analyze dynamic supplier risks of large-scale and complex equipment and study the probability distribution of the occurring risks. Design/methodology/approach -Starting from the dynamic and correlated supplier risks of large-scale and complex equipment, a two-dimension frame to analyze these risks is established. A maximum entropy model is also built to research the probability distribution of the risks; then, K-T conditions are proved to solve … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…Pan and Zheng [36] studied optimal resource allocation under the conditions of current equipment, technology and the operational level in the large iron and steel complex. Cheng et al [37] proposed a solution of MRO support system which considering Maintenance, Repair and Operations requirements to allocate MR. Yuan et al [38] established a two-dimension frame to analyse dynamic supplier risks of large-scale and complex equipment and study the probability distribution of the occurring risks. Zouhaier et al [39] used a multi-objective genetic algorithm to optimize resource geometry in designing a mechatronic system.…”
Section: Mrco-lcmentioning
confidence: 99%
“…Pan and Zheng [36] studied optimal resource allocation under the conditions of current equipment, technology and the operational level in the large iron and steel complex. Cheng et al [37] proposed a solution of MRO support system which considering Maintenance, Repair and Operations requirements to allocate MR. Yuan et al [38] established a two-dimension frame to analyse dynamic supplier risks of large-scale and complex equipment and study the probability distribution of the occurring risks. Zouhaier et al [39] used a multi-objective genetic algorithm to optimize resource geometry in designing a mechatronic system.…”
Section: Mrco-lcmentioning
confidence: 99%