2020
DOI: 10.1016/j.asej.2020.02.003
|View full text |Cite
|
Sign up to set email alerts
|

Economic investigation for building a high-speed rail in developing countries: The case of Egypt

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 7 publications
0
6
0
Order By: Relevance
“…Belal et al . (2020) studied the economic viability of high-speed rail lines in developing countries through identifying the potential costs and benefits.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Belal et al . (2020) studied the economic viability of high-speed rail lines in developing countries through identifying the potential costs and benefits.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Other factors were summarized in the Handbook on the external costs of transport (Move, 2019). Belal et al (2020) studied the economic viability of high-speed rail lines in developing countries through identifying the potential costs and benefits. They assessed various kinds of benefits and costs through a cost-benefit analysis (CBA).…”
Section: Literature Reviewmentioning
confidence: 99%
“…that can limit commercial speed below 250-300 km/h [15]. The construction of new HSR infrastructure includes three main types of costs: planning costs and land costs, infrastructure construction costs and superstructure costs [16]. The time required for planning and technical design of HSR lines varies greatly from project to project, depending on their specific legal and administrative arrangements.…”
Section: Development Of High-speed Rail In Europementioning
confidence: 99%
“…For example, the project managers of the Beijing-Shanghai HSR needed to employ construction technology such as high-speed, long-span, deep-water bridges, ballast-less tracks, the laying and welding of long tracks, and track vibration mitigation. In order to solve these problems, HSR projects require huge investments that are two–three times those required for normal train systems [ 2 ]. Moreover, the organizational management of HSR projects is difficult because the projects span several administrative regions and include stakeholders at multiple levels, such as central and local governments, project developers, experts and contractors.…”
Section: Introductionmentioning
confidence: 99%
“…(1) First, within the project system, the traditional project management objectives of investment, quality, duration and safety should be achieved [5]. (2) Secondly, the HSR project is intended to promote regional economic development along the train line and avoid ecological damage, health hazards and social injustice. Therefore, the external objective of the HSR project is to achieve sustainable performance in the economy-ecology-social system [6].…”
Section: Introductionmentioning
confidence: 99%