Conference Record of the Twenty Sixth IEEE Photovoltaic Specialists Conference - 1997
DOI: 10.1109/pvsc.1997.654101
|View full text |Cite
|
Sign up to set email alerts
|

Economic recycling of CdTe photovoltaic modules

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
19
0

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(19 citation statements)
references
References 2 publications
0
19
0
Order By: Relevance
“…These processes have yielded up to 90% and 95% recovery of silicon and glass, respectively. Thinfilms coppereindiumegallium-diselenide (CIGS) and cadmium telluride (CdTe) modules first will be shredded, spun, and then undergo leaching and precipitation in order to separate out ethyl vinyl acetate (EVA) and organics while recovering glass and active materials following the First Solar process described in literature (Berger et al, 2010;Bohland et al, 1997;J. K. Choi and Fthenakis, 2010;Goozner et al, 1999;Karagiannidis and Moussiopoulos, 1998;Marwede et al, 2013).…”
Section: Recovery Technologymentioning
confidence: 99%
See 1 more Smart Citation
“…These processes have yielded up to 90% and 95% recovery of silicon and glass, respectively. Thinfilms coppereindiumegallium-diselenide (CIGS) and cadmium telluride (CdTe) modules first will be shredded, spun, and then undergo leaching and precipitation in order to separate out ethyl vinyl acetate (EVA) and organics while recovering glass and active materials following the First Solar process described in literature (Berger et al, 2010;Bohland et al, 1997;J. K. Choi and Fthenakis, 2010;Goozner et al, 1999;Karagiannidis and Moussiopoulos, 1998;Marwede et al, 2013).…”
Section: Recovery Technologymentioning
confidence: 99%
“…In addition to the process specific equipment, we assume a forklift and conveyor belts are required for transporting materials throughout the plant. Conveyor belts are assumed to be used to feed into size reduction and spinning processes as described in literature (Bohland et al, 1997;Hu et al, 2002). We estimate the equipment cost is $1500 and $9000 for a conveyor system and forklift based on data from equipment manufacturers (Delgado et al, 2008;Ekmekçio glu et al, 2010;Gorsevski et al, 2012;Korucu and Karademir, 2013;Sharifi et al, 2009;Sumathi et al, 2008;Toyota Industrial Equipment, 2014;Grainger Inc, 2014).…”
Section: Recovery Technologymentioning
confidence: 99%
“…The cadmium and tellurium dissolve in the solution. Adding caustic solution, such as sodium carbonate, to adjust the PH value can make the cadmium and tellurium precipitate [26].…”
Section: Recycling Of Cdte Pv Modulesmentioning
confidence: 99%
“…TeO 2 can dissolve in the alkaline solution and be separated from CdCO 3 . High-purity tellurium can be obtained by electrowinning [26].…”
Section: Recycling Of Cdte Pv Modulesmentioning
confidence: 99%
“…This solves two problems at once, namely, keeping potentially hazardous materials out of the environment and reducing the need for additional mining and/or refining of new materials. Semiconductor vendors have indicated a willingness to accept used modules, and to extract and purify the CdTe, CdS, or Cu(InGa)Se 2 for resale and reuse [17,18].…”
Section: Photovoltaics Is Polluting Just Like All High-technology or mentioning
confidence: 99%