2019
DOI: 10.1016/j.resourpol.2019.101450
|View full text |Cite
|
Sign up to set email alerts
|

Economic valuation of coal deposits – The value of geological information in the resource recognition process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(12 citation statements)
references
References 5 publications
0
12
0
Order By: Relevance
“…Technology improves and affect directly the profit (Blalock and Gertler, 2008); in the firm, the basic unit of the measurement unit is profit before depreciation, interest and tax (PBDITA); some are used as earning before interest, taxes depreciation, and amortisation (Kopacz et al , 2019). Similarly, Bellucci et al (2019) used PBDITA to measure the impact.…”
Section: Methodsmentioning
confidence: 99%
“…Technology improves and affect directly the profit (Blalock and Gertler, 2008); in the firm, the basic unit of the measurement unit is profit before depreciation, interest and tax (PBDITA); some are used as earning before interest, taxes depreciation, and amortisation (Kopacz et al , 2019). Similarly, Bellucci et al (2019) used PBDITA to measure the impact.…”
Section: Methodsmentioning
confidence: 99%
“…The interpolation has helped construct isoline plan of predictive magnetic iron content (Figs. [4][5][6].…”
Section: Figure 3 Dependence Of Magnetic Ore Content Between the Test...mentioning
confidence: 99%
“…Scheduling of operations as well as achieving of output with the specified content of useful component is one of the most important missions of mining. The abovementioned should involve systematic designing and modeling of a mining enterprise operations and production processes at the opening stage [1]- [4]. To solve the problem, the fullest idea of mining and geological conditions of a deposit is required in addition to its geometry and spatial arrangement of excavating and technological indices.…”
Section: Introductionmentioning
confidence: 99%
“…the system construction was started from ordering the area of quality management, Diagram 1, where the results of scientific research were taken into account (Grudowski 2004;Wojtowicz 2003, Kopacz et al 2019Dyczko 2021aDyczko , 2022aDyczko et al 2020), which confirms that the implementation and operation of a quality-management system provides numerous benefits.…”
Section: Introductionmentioning
confidence: 95%