2014
DOI: 10.1109/tie.2013.2278525
|View full text |Cite
|
Sign up to set email alerts
|

Economical Design of Utility-Scale Photovoltaic Power Plants With Optimum Availability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0
1

Year Published

2015
2015
2020
2020

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 62 publications
(22 citation statements)
references
References 18 publications
0
21
0
1
Order By: Relevance
“…To tackle the challenge, this paper proposes a new online overvoltage prevention (OOP) control strategy to maintain PV terminal voltages within specified range while maximizing the PV energy yields. [12] this paper presents the reliability estimation of the power stages in three grid-connected photovoltaic systems. The circuits analyzed are an integrated topology, a two-stage configuration, and a threestage one, all commutating in the hard-switching mode.…”
Section: J M Guerrero 2013mentioning
confidence: 99%
See 1 more Smart Citation
“…To tackle the challenge, this paper proposes a new online overvoltage prevention (OOP) control strategy to maintain PV terminal voltages within specified range while maximizing the PV energy yields. [12] this paper presents the reliability estimation of the power stages in three grid-connected photovoltaic systems. The circuits analyzed are an integrated topology, a two-stage configuration, and a threestage one, all commutating in the hard-switching mode.…”
Section: J M Guerrero 2013mentioning
confidence: 99%
“…E. Kakosimos, 2013 [14] In this paper, a photovoltaic (PV)-system maximum power point (MPP) tracking (MPPT) control strategy employing a predictive digital current-controlled converter implemented in conventional hardware resources is presented. [15] this paper investigates a formulation of the Optimal Power Flow (OPF) problem, which aims to find the predictive optimal operational state of a low voltage smart grid.…”
Section: F Chanand H Calleja 2011mentioning
confidence: 99%
“…2) Confiabilidade/disponibilidade da energia [36], [37]. 3) Suporte a diferentes condições ambientais [19][8].…”
Section: B Requisitos De Robustez E Confiabilidadeunclassified
“…The output power of PV systems differs from the power generated by conventional sources due to the high uncertainty of PV power output, and the availability associated with PV system components [2][3][4] and their relative configurations. Electric power utilities and customers are therefore The LOLE can be defined as the expected period of time during which the system load exceeds the available generating capacity.…”
Section: Introductionmentioning
confidence: 99%