“…Based on this research finding, the optimum design and condition is found for 2-stages digestion where TSS = 4% and 1 bar, with temperature at first and second digester is 60oC and 42oC, respectively, which produces 7,725 kg/day biogas. The optimum methane purification is found in 5-stage scrubber at 10 bars, with water discharge of 11,000 kg/hr, which produces 7,627 kg/hour CH4 with 97.24% methane content [3]. Represented a biogas source of green energy that is of great interest as an alternative to the depletion of fossil fuel.…”