International Conference on Transportation and Development 2018 2018
DOI: 10.1061/9780784481547.005
|View full text |Cite
|
Sign up to set email alerts
|

Effect of Road Construction Projects on Travel Time Reliability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…Even though the analysis was done at a very small spatial granularity, it was limited to travel-time-based measures (average travel time, planning time, buffer time, and buffer time index) and did not include any volume considerations. The study found that project type, day of week, and time of day were influencers on how measures change between the before, during, and after periods ( 10 ).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Even though the analysis was done at a very small spatial granularity, it was limited to travel-time-based measures (average travel time, planning time, buffer time, and buffer time index) and did not include any volume considerations. The study found that project type, day of week, and time of day were influencers on how measures change between the before, during, and after periods ( 10 ).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Kwon et al (2011) proposed an empirical, corridor-level method to divide the travel time unreliability or variability over a freeway section into incidents, weather, work zones, special events, and inadequate base capacity or bottlenecks for developing effective strategies to mitigate congestion. Yesantarao and Pulugurtha (2017) and Kukkapalli and Pulugurtha (2018) examined the travel time and travel time variations before, during, and after the completion of selected road construction projects by computing the ratios of travel time performance-based measures before, during and after the completion of selected road construction projects. The subject link, upstream link and downstream link characteristics were observed to have a significant effect on the link-level average travel times due to a road construction project (Kukkapalli & Pulugurtha, 2021).…”
Section: Introductionmentioning
confidence: 99%