2018
DOI: 10.1177/0361198118797207
|View full text |Cite
|
Sign up to set email alerts
|

Effective Post-Construction Evaluation Practices for Work Zone Management Strategies

Abstract: State departments of transportation (DOTs) invest a significant amount of effort to develop and implement transportation management plans (TMPs) in order to effectively manage the traffic flow of work zones and secure the safety of workers and the traveling public during construction of highway projects. State DOTs typically spend an average 3% to 5% of the total construction cost for TMP development and implementation, but some urban projects, in highly congested areas, may require up to 30% of the total cons… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
9
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(9 citation statements)
references
References 2 publications
0
9
0
Order By: Relevance
“…Each DOT may have its own definition for project success. However, a post-construction evaluation may bring benefits to all of them; besides bringing benefits to the agency and the overall projects, Volk et al (2018) state that an evaluation can provide improvement to TMPs.…”
Section: Post-construction Evaluationmentioning
confidence: 99%
See 4 more Smart Citations
“…Each DOT may have its own definition for project success. However, a post-construction evaluation may bring benefits to all of them; besides bringing benefits to the agency and the overall projects, Volk et al (2018) state that an evaluation can provide improvement to TMPs.…”
Section: Post-construction Evaluationmentioning
confidence: 99%
“…Both performance measurements and TMPs can help manage work zones and monitoring and analyzing them can help the project management. Each DOT can deal differently with TMPs, and data collection and analysis for performance measurements (Volk et al, 2018). Some DOTs might develop their own TMPs, while others might have consultants and/or contractors or a combination of DOT and consultants/contractors to develop those TMPs (Volk et al, 2018).…”
Section: Performance Measuresmentioning
confidence: 99%
See 3 more Smart Citations