Effects of Axial Air Deck on Blast-Induced Ground Vibration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 27 publications
(9 citation statements)
references
References 49 publications
1
8
0
Order By: Relevance
“…The vibration velocity decays rapidly within a certain distance, and then the decay rate begins to decrease with the continuous increase of the distance. This phenomenon has also been widely reported by other researchers (Cheng et al, 2022; Zhang et al, 2021).…”
Section: Field Monitoring and Data Analysissupporting
confidence: 87%
“…The vibration velocity decays rapidly within a certain distance, and then the decay rate begins to decrease with the continuous increase of the distance. This phenomenon has also been widely reported by other researchers (Cheng et al, 2022; Zhang et al, 2021).…”
Section: Field Monitoring and Data Analysissupporting
confidence: 87%
“…So, ALE algorithm is used for air, explosives, stemming and slightly weathered sandy mudstone units, and Lagrange algorithm is used for miscellaneous fill, clay, and lining. According to some research studies(Kuhlemeyer and Lysmer, 1973; Cheng et al, 2021), blasting stress wavelength needs to occupy 8–10 elements to avoid data distortion. The mesh around the cutting hole is divided by fine mesh, and the mesh size is 20 mm.…”
Section: Numerical Model and Verificationmentioning
confidence: 99%
“…By substituting the dynamic tensile strength of concrete 3.06 MPa into formula (11), the PPV of subway tunnel lining is 13.06 cm/s. Some studies have studied different tunnels and proposed different standards (Jiang and Zhou, 2012; Liang et al, 2013; Liu et al, 2020; Mussa et al, 2018), which show that the safety standard according to PPV is related to the general situation of field engineering (Cheng et al, 2021).…”
Section: Subway Tunnel Lining Safety Distance Judgmentmentioning
confidence: 99%
“…Rock breakage is imperative to a variety of rock engineering projects, such as mining and tunnelling [ 1 , 2 , 3 ]. With the accelerating progress of rock engineering, the drawbacks of the drilling-and-blasting method, such as great rock damage, violent ground vibration, significant operating risk, low energy utilization, and intermittent operation, have been increasingly exposed [ 4 , 5 ]. These disadvantages seriously restrict the safe and efficient construction of rock engineering projects.…”
Section: Introductionmentioning
confidence: 99%