“…S2 = {P3 (1,4,6), P4 (1,3,6,7,8), P5 (1,2,5,4,7,8)} is an optimal corresponding path set. In the first scenario, the links (1, 3), (3,6) and (7,8) are monitored twice; they belong each to two monitored paths. The deployment of an additional monitor in the second scenario reduces the number of bi-monitored links to one link (6,7).…”