“…Therefore, with the help of Nguyen's basic shape of the network, we constructed a more complex network, where the OD of the network consists of nodes 1,2,3,4 demanding OD from each other, and the resulting traffic will fill the entire network. Road segments (10,11), (7,6), (13,9) is set to simulate a partially aging road network, and the three roads have different levels of decaying to simulate real-world conditions. All OD demand points and decaying roads are equipped with tolling devices or similar detectors to ensure that the number of vehicles on the road at the corresponding moment and the OD data can be obtained.…”