Elaborating factors affecting visual control in a big room

Abstract: Purpose The “big room” concept and lean philosophy have become increasingly popular in the construction industry. Visual control is a central part of lean philosophy and the big room concept; its aim is to improve information flow, joint problem-solving and real-time decision-making. Visual control facilitates effective project management by providing information on what work is performed and why, customer requirements, deadlines, work status and potential problems. This study aims to explore how visualisation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 17 publications
(12 citation statements)
references
References 28 publications
0
11
0
1
Order By: Relevance
“…In addition to the computer environment such as the satisfaction of the owner, interventions of the permitting organizations, coordination of construction contractors and subcontractors, and feedback from design consultants, a progressive implementation process based on human relations and mutual dialogue should also be designed. These stakeholders have their own goals in the project, often affecting process optimization, often not contributing to the project [5]. For example; failure of a subcontractor to supply the required material at the scheduled time may cause serious disruptions in the process.…”
Section: Introductionmentioning
confidence: 99%
“…In addition to the computer environment such as the satisfaction of the owner, interventions of the permitting organizations, coordination of construction contractors and subcontractors, and feedback from design consultants, a progressive implementation process based on human relations and mutual dialogue should also be designed. These stakeholders have their own goals in the project, often affecting process optimization, often not contributing to the project [5]. For example; failure of a subcontractor to supply the required material at the scheduled time may cause serious disruptions in the process.…”
Section: Introductionmentioning
confidence: 99%
“…This research adds another solution to optimism bias in the form of 4D visualization as it helps the project team visualize the construction activities of the megaproject, providing a more realistic picture, thereby increasing the ability to forecast and mitigate the optimism bias risk among construction activities before they arise. This visualization can be categorized as visual control wherein effective project management can be enhanced by a visualization exercise to provide information on the work performed along with its potential problems (Majava, Haapasalo and Aaltonen, 2019).…”
Section: Discussionmentioning
confidence: 99%
“…Meetings were carried out in a digital 'Obeya' room where collaborative planning was aided by digital visual management. Images, drawings, and 3D BIM models were used to inform and communicate planned works between trade contractors (Majava et al 2019). The rooms help to arrive at decisions faster, provide a framework for waste elimination and asset logistical and sequencings issues.…”
Section: Lean Constructionmentioning
confidence: 99%