2014
DOI: 10.1103/physrevstab.17.031003
|View full text |Cite
|
Sign up to set email alerts
|

Electron beam deceleration measurements using the decelerator test beam line in the Compact Linear Collider test facility

Abstract: We discuss beam deceleration through a series of 12 power extraction and transfer structures, at the CLIC test facility 3 at CERN, as a proof-of-principle of the CLIC deceleration scheme. Up to 36% of the kinetic energy of an electron drive beam is extracted and converted to 12 GHz rf power. We look at the average and maximum energy loss of the particles, and compare them with simulations performed with the PLACET tracking code. The measured final energy is also compared to predictions based on the measured be… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 7 publications
0
0
0
Order By: Relevance