Abstract-In this paper we present a simple framework for planning options when deploying Fibre to the Curb, using G.Fast as technology. We present a framework of eight possible planning options, roll-out scenarios, coming from three main planning choices. We elaborate the mathematical approach of each of these eight options, using combinations of existing methods. We also show the results of a real life case, rolling out Fibre to the Curb in Amsterdam and The Hague, resulting in an example of the calculation time needed and the indication of the costs of such a roll-out.