2016
DOI: 10.1016/j.renene.2016.08.024
|View full text |Cite
|
Sign up to set email alerts
|

Employing demand side management for selection of suitable scenario-wise isolated integrated renewal energy models in an Indian remote rural area

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
9
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 32 publications
(9 citation statements)
references
References 31 publications
0
9
0
Order By: Relevance
“…The concept of DSM has inspired the attention of researchers working on autonomous IHRESs. Rajanna and Saini [29] used GA and PSO algorithms to analyze the performance of four un-electrified village zones in India with a DSM strategy using three investment-based scenarios, such as low investment with high rating appliances, medium investment with moderate rating appliances, and high investment with low rating appliances and found that the systems with DSM strategy had the lowest costs using PSO.…”
Section: Literature Review Of Demand-side Managementmentioning
confidence: 99%
“…The concept of DSM has inspired the attention of researchers working on autonomous IHRESs. Rajanna and Saini [29] used GA and PSO algorithms to analyze the performance of four un-electrified village zones in India with a DSM strategy using three investment-based scenarios, such as low investment with high rating appliances, medium investment with moderate rating appliances, and high investment with low rating appliances and found that the systems with DSM strategy had the lowest costs using PSO.…”
Section: Literature Review Of Demand-side Managementmentioning
confidence: 99%
“…Economic consideration includes investment decision related to initial capital costs, maintenance costs, replacement costs, grid buying/selling costs, and EV charging costs. [ 39 ] Usually, estimate of levelized cost of energy is preferred and utilized for critical decision making in investment plan. However, it excludes the penalty cost for local load shedding or excess generation which may impact the economic feasibility of community level distributed generation systems over the project life cycle.…”
Section: Deterministic Planning Of Prosumer Centric Renewable Based E...mentioning
confidence: 99%
“…21 Chauhan and Saini 22 employed the demand response methodology for electrifying a site in India using an off-grid HRES. Rajanna and Saini 23 proposed a demand-side management approach for component sizing and suitable configuration selection for an HRES integrated with a battery.…”
Section: Introductionmentioning
confidence: 99%