2015 IEEE 13th International Conference on Industrial Informatics (INDIN) 2015
DOI: 10.1109/indin.2015.7281906
|View full text |Cite
|
Sign up to set email alerts
|

Enabling flexible automation system hardware: Dynamic reconfiguration of a real-time capable field-bus

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 39 publications
0
2
0
Order By: Relevance
“…Device outage as well as newly introduced devices in the network require the dynamic reconfiguration of the Fieldbus. The work presented in [74] provides a foundational groundwork to the presented adaptation concept which can extend its autonomy in terms of adapting to disruptions in the shop floor.…”
Section: Reconfiguration Of Real-time Fieldbusmentioning
confidence: 99%
See 1 more Smart Citation
“…Device outage as well as newly introduced devices in the network require the dynamic reconfiguration of the Fieldbus. The work presented in [74] provides a foundational groundwork to the presented adaptation concept which can extend its autonomy in terms of adapting to disruptions in the shop floor.…”
Section: Reconfiguration Of Real-time Fieldbusmentioning
confidence: 99%
“…On the PLC controllers, the SCUs are marked with a dotted line box to indicate their fixed nature in terms of component placement. By definition, SCUs require real time communication with the field devices since they read and write signals directly from and onto the devices [74]. This constrains the network wiring plan, i.e., PLC IOs coupling with the field devices, to be fixed and pre-known.…”
Section: Concept Overviewmentioning
confidence: 99%