2023
DOI: 10.1016/j.aei.2023.101878
|View full text |Cite
|
Sign up to set email alerts
|

End-to-end point cloud-based segmentation of building members for automating dimensional quality control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
8
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 19 publications
(8 citation statements)
references
References 80 publications
0
8
0
Order By: Relevance
“…Additionally, even after the completion of construction, these technologies can be utilized to monitor the displacement of various structural elements, evaluate the safety and stability of the structure, and facilitate ongoing maintenance of the building (Yin et al, 2023). H. S. Park et al (2007) introduced terrestrial laser scanning (TLS) for structural deformation measurements, and this technology continues to be actively researched by scholars in the construction field (Ge et al, 2023;Mirzaei et al, 2023;S. W. Park et al, 2017;Zhou et al, 2022).…”
Section: Introductionmentioning
confidence: 99%
See 4 more Smart Citations
“…Additionally, even after the completion of construction, these technologies can be utilized to monitor the displacement of various structural elements, evaluate the safety and stability of the structure, and facilitate ongoing maintenance of the building (Yin et al, 2023). H. S. Park et al (2007) introduced terrestrial laser scanning (TLS) for structural deformation measurements, and this technology continues to be actively researched by scholars in the construction field (Ge et al, 2023;Mirzaei et al, 2023;S. W. Park et al, 2017;Zhou et al, 2022).…”
Section: Introductionmentioning
confidence: 99%
“…The quality of construction components that make up buildings and infrastructure plays a crucial role in determining the success or failure of construction projects. In particular, the dimensional quality of construction components is critical (Mirzaei et al., 2023), and therefore ensuring its control from the offsite production stage is recommended (Rausch et al., 2020; Q. Wang et al., 2017). However, measuring construction component dimensions is labor‐intensive and time‐consuming, resulting in high costs and the potential for human errors (Li et al., 2018; Mirzazade et al., 2023; Pan & Zhang, 2022; Q. Wang et al., 2017; Yeum & Dyke, 2015).…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations