2020
DOI: 10.1109/access.2020.3027018
|View full text |Cite
|
Sign up to set email alerts
|

Energy-Efficient Integration Optimization of Production Scheduling and Ladle Dispatching in Steelmaking Plants

Abstract: The existing production scheduling mode ignores ladle dispatching resulting in the increase of energy consumption in ladle heating and instability in production. Hence, we study the energy-efficient integration optimization of production scheduling and ladle dispatching in this paper. Specifically, a mixed integer linear programming model is formulated to coordinate the time-dependent correlations between them and quantify the energy consumption of them. Moreover, an enhanced migrating birds optimization algor… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
12
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(12 citation statements)
references
References 43 publications
0
12
0
Order By: Relevance
“…Wang [74] carried out effective process planning and production scheduling optimization from both process and system stages and applied artificial neural networks to achieve multi-objective optimization, providing an effective sustainable development example for enterprises. Han et al [75] constructed an energy-saving integrated model by combining production scheduling and ladle scheduling in the steel industry. They fully considered the time dependence of the two scheduling decisions and designed an enhanced migrating birds optimization algorithm for a high-quality solution to achieve effective energy saving.…”
Section: Energy-target-based Schedulingmentioning
confidence: 99%
“…Wang [74] carried out effective process planning and production scheduling optimization from both process and system stages and applied artificial neural networks to achieve multi-objective optimization, providing an effective sustainable development example for enterprises. Han et al [75] constructed an energy-saving integrated model by combining production scheduling and ladle scheduling in the steel industry. They fully considered the time dependence of the two scheduling decisions and designed an enhanced migrating birds optimization algorithm for a high-quality solution to achieve effective energy saving.…”
Section: Energy-target-based Schedulingmentioning
confidence: 99%
“…costs for the mixers starts represent the start up energy and wear (7). Safe plant behaviour under failure is ensured by existing plant safety systems.…”
Section: Optimal Scheduling Problemmentioning
confidence: 99%
“…An optimization approach for constraint scheduling in steelmaking processes is shown in [5]. Recent papers [6], [7] present mixed integer programming approaches for scheduling parallel industrial processes. Theoretical work on model predictive control for switching process variables and average dwelltimes mostly bases on [8].…”
Section: Introductionmentioning
confidence: 99%
“…A steel ladle scheduling system integrated system was established [9]. The impact of ladle on steelmaking scheduling was analysed [10]. The operation of ladle and calculated the number of ladles was considered reasonably [11].…”
Section: Introductionmentioning
confidence: 99%