2024
DOI: 10.6001/energetika.2023.69.1.3
|View full text |Cite
|
Sign up to set email alerts
|

Energy saving during the partial heat load period by integrating a steam-heated absorption heat pump into the thermal scheme of a PT-60/70-130/13 steam turbine

Aleksandr Shubenko,
Mikola Babak,
Aleksandr Senetskyi
et al.

Abstract: The task of determining the efficiency of operation of an absorption heat pump (AHP) with steam heating (COP conversion factor = 1.71) integrated into the thermal circuit of a PT-60/70-130/13 steam turbine that releases production steam and hot water during the partial heat load period (spring and autumn; also referred to as the inteheating period) is being solved in this paper. Variants of operation of the PT-60/70-130/13 with an integrated AHP with a capacity of ~17.25 MW in the partial … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 5 publications
0
0
0
Order By: Relevance