2011
DOI: 10.1016/j.apenergy.2011.06.037
|View full text |Cite
|
Sign up to set email alerts
|

Engineering analysis of uncertainties in the performance evaluation of CHP systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…PE consumption of biomass boiler is set to zero. It is worth noting that the proposed assumptions are sufficient to perform the energy analysis proposed in this paper, nevertheless it must to be taken into account that the primary energy saving in real word applications is affected by several factors, such as the measurement of fuel energy content, the gross electrical energy produced, auxiliary energy consumed, and heat recovered [22,23].…”
Section: Model For the Energy And Economic Assessment Of The Systemmentioning
confidence: 99%
“…PE consumption of biomass boiler is set to zero. It is worth noting that the proposed assumptions are sufficient to perform the energy analysis proposed in this paper, nevertheless it must to be taken into account that the primary energy saving in real word applications is affected by several factors, such as the measurement of fuel energy content, the gross electrical energy produced, auxiliary energy consumed, and heat recovered [22,23].…”
Section: Model For the Energy And Economic Assessment Of The Systemmentioning
confidence: 99%