“…The field monitoring and analysis of the cutoff wall in Daning Reservoir is a typical geotechnical safety monitoring and analysis. At present, the safety monitoring and data analysis method in geotechnical engineering is widely used [ [14] , [15] , [16] , [17] ], its performance is closely related to the design scheme, such as the verification and perfection of the arch dam test load method theory [ 18 ], verification of the stress and strain characteristics and calculation assumptions of mass concrete [ [19] , [20] , [21] , [22] ], analysis and determination of permeability and deformation of cutoff wall [ [23] , [24] , [25] ], stability verification of the foundation pit supporting structure [ [26] , [27] , [28] ].…”