Engineering Risk Management in Performance-Based Building Environments

Abstract: Nowadays, a wide range of stakeholders seek explicit performance and risk information on construction projects. These stakeholders include end-users, authorities, insurance companies and financial institutions, among others. They look for proof that engineering risks are being properly managed and that specified performance-based requirements are fulfilled throughout all stages of the project (e.g. technical requirements related to the building such as structural safety, structural serviceability, structural d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
30
0
2

Year Published

2015
2015
2022
2022

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 31 publications
(32 citation statements)
references
References 8 publications
0
30
0
2
Order By: Relevance
“…The method applied to identify and assess "high level" project risks was as follows [2], [3], [5], [6], [10], [16]:…”
Section: Methods Of Risk Identificationmentioning
confidence: 99%
See 2 more Smart Citations
“…The method applied to identify and assess "high level" project risks was as follows [2], [3], [5], [6], [10], [16]:…”
Section: Methods Of Risk Identificationmentioning
confidence: 99%
“…Although the presented approach of projects risks assessment by linking risks impacts with their likelihood occurrence is quite well described in accessible literature [2], [3], [4], [6], [10], [13], [14], [16] but there is an insufficient number of construction projects reported and tested in measurable way. The data of enterprises in construction industry are under confidentiality agreements and well protected by global clients, project management companies and credit bank analysts.…”
Section: Indicative Research Summarymentioning
confidence: 99%
See 1 more Smart Citation
“…Consequently, conflicts that may be produced in the developmental process of the construction are solved, repetition and alternation are lowered. This leads to a shortened time for the developmental process of the construction while the cost is reduced and the quality is enhanced [8].…”
Section: Phase Synergymentioning
confidence: 99%
“…This management solution is based on the concept of Risk-Managed Performance-Based Building (RM-PBB). The full outreach of this concept and the way in which it may benefit different stakeholders throughout the various stages of a building project are described in Almeida et al (2014).…”
Section: Introductionmentioning
confidence: 99%