1986
DOI: 10.1109/mper.1986.5528257
|View full text |Cite
|
Sign up to set email alerts
|

Enhanced Algorithms for Transmission Protective Relay Coordination

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
9
0

Year Published

1987
1987
2011
2011

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(9 citation statements)
references
References 6 publications
0
9
0
Order By: Relevance
“…Comparing zone 2 impedance settings, the UW settings give better coverage than those of PSPL. This is made possible by the Successive Zone Coordination Algorithm [4] which ensures complete coordination of the zones as well as maximum coverage of the lines. The program also computes zone 3 settings but they are not included in Table 5 since Puget Power does not use zone 3 normally.…”
Section: Interactionmentioning
confidence: 99%
See 3 more Smart Citations
“…Comparing zone 2 impedance settings, the UW settings give better coverage than those of PSPL. This is made possible by the Successive Zone Coordination Algorithm [4] which ensures complete coordination of the zones as well as maximum coverage of the lines. The program also computes zone 3 settings but they are not included in Table 5 since Puget Power does not use zone 3 normally.…”
Section: Interactionmentioning
confidence: 99%
“…From the inception of the project, Puget Sound Power and Light Company (Puget Power) has been participating in this effort and recently ten other utilities have also begun testing this package. The algorithms developed and the utility of databases have already been reported [1][2][3][4][5].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…Dwarakanath and Nowitz [2] have given graphic procedure for finding the same. Later, Damborg and Ramaswamy [3], [4] have proposed new algorithms for determining the break points, a Relative Sequence Matrix (RSM), and Set of Sequential Pairs (SSP). This method uses fundamental loop matrix and some other arbitrary matrices from which the BP relays can be found.…”
Section: Summary Of the Past Workmentioning
confidence: 99%