All Days 2016
DOI: 10.2118/182484-ms
|View full text |Cite
|
Sign up to set email alerts
|

Ensuring Safe Facility Blowdown and Lessons Learnt from Incident Investigation

Abstract: A facility blowdown in the oil and gas industry is a safety critical operation; required to ensure the safe shut-down of processing facilities during a plant emergency. In a full facility blowdown operation, the entire plant is isolated into a number of segments and then depressurized into the facility’s flare system. The outcome of a blowdown event is dependent on the performance of a number of safety critical control system and final elements in the plant; these are designed to ensure the safe and successful… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…While it is premature to identify the process­(es) responsible, it is unlikely that we observed a rare phenomenon. High emissions may be released from nonroutine venting during a blowdown for equipment depressurization in maintenance operations associated with turnarounds or shut-downs . However, if these events are uncorrelated between platforms, it is unlikely that such infrequent practices were present on all three sites (SI Appendix S8).…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…While it is premature to identify the process­(es) responsible, it is unlikely that we observed a rare phenomenon. High emissions may be released from nonroutine venting during a blowdown for equipment depressurization in maintenance operations associated with turnarounds or shut-downs . However, if these events are uncorrelated between platforms, it is unlikely that such infrequent practices were present on all three sites (SI Appendix S8).…”
Section: Resultsmentioning
confidence: 99%
“…High emissions may be released from nonroutine venting during a blowdown for equipment depressurization in maintenance operations associated with turnarounds or shut-downs. 35 However, if these events are uncorrelated between platforms, it is unlikely that such infrequent practices were present on all three sites (SI Appendix S8). Although there is some probability that flights sampled a rare high emission spike from another source of nonroutine venting, the probability of observing infrequent high emission pulses from multiple facilities on multiple days is low: we estimate less than 4% (SI Appendix S8).…”
Section: ■ Materials and Methodsmentioning
confidence: 99%