“…At this point, it must be noted that, in order for the βε MC 4.0 expression to truly represent the manufacturing complexity of a mass customization production system operating within an Industry 4.0 environment, the complexity contribution of the product, process, and resources elements must be taken into account. ese elements refer to (i) Product: the different number of manufactured products, the number of number of corresponding components and functions, and the overall products' mix ratio (ii) Process: the different routings for each product and the corresponding processing times (iii) Resources: the different types of machinery, number and type of operations capable of performing, and number of required setups Mass customization measurement [24,27,67] Mass customization and complexity [27,68,69] Mass customization and flexibility [22,[72][73][74][75] Flexibility and complexity [30] 4 Mathematical Problems in Engineering Now, Martínez-Olvera explained in his work of [76] (equation 1) and [77] (equation 2) why formulations such as the ones presented by [58,86] need to be modified in order to reflect the impact the BOM structure has on the process flow. In a similar way, equations (1) and (2) must be adapted in order to reflect the manufacturing complexity contribution to the mass customization production system operating within an Industry 4.0 environment:…”