2016
DOI: 10.1016/j.enbuild.2016.07.066
|View full text |Cite
|
Sign up to set email alerts
|

Environmental assessments and economic performance of BAPV and BIPV systems in Shanghai

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
15
0
1

Year Published

2018
2018
2021
2021

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 78 publications
(16 citation statements)
references
References 35 publications
0
15
0
1
Order By: Relevance
“…Because of the utilization of natural lighting in skylights and classrooms, the rated power consumption totals up to be a mere 8% of the total rated power for the whole university. Other utilitarian consumers are the data centre, elevators, chilled water T A B L E 2 Comparative study of BIPV work and the proposed research highlight 19,[41][42][43][44][45][46][48][49][50][51][52][53][54][55][56][57][58][59][60] No. Predicted energy outputs from array side and grid input side decrease in a few months because of influence from weather parameters, module temperature, and other system components.…”
Section: Energy Statistics and Analysismentioning
confidence: 99%
“…Because of the utilization of natural lighting in skylights and classrooms, the rated power consumption totals up to be a mere 8% of the total rated power for the whole university. Other utilitarian consumers are the data centre, elevators, chilled water T A B L E 2 Comparative study of BIPV work and the proposed research highlight 19,[41][42][43][44][45][46][48][49][50][51][52][53][54][55][56][57][58][59][60] No. Predicted energy outputs from array side and grid input side decrease in a few months because of influence from weather parameters, module temperature, and other system components.…”
Section: Energy Statistics and Analysismentioning
confidence: 99%
“…It was reported that the integration of the BIPV modules on the skylight improved the building performance and reduces the cooling and lighting load of the building. Wang et al 15 assessed the performance of 3 kWp Building Attached Photovoltaic (BAPV) and 10 kW BIPV system in Shanghai. It was reported that energy payback time and greenhouse-gas payback time for BAPV were 4.2 and 1.3 years while that for BIPV were 3.1 and 0.4 years, respectively.…”
Section: Introductionmentioning
confidence: 99%
“…A large number of studies address the feasibility of PV systems for electrification of buildings. For instance, Wang et al evaluated the economic performance of 3 kWp BAPV and 10 kW BIPV systems in Shanghai in terms of net present value (NPV) and payback period . The payback period was found to be 4.2 and 3.1 years for BAPV and BIPV systems, respectively.…”
Section: Introductionmentioning
confidence: 99%
“…For instance, Wang et al evaluated the economic performance of 3 kWp BAPV and 10 kW BIPV systems in Shanghai in terms of net present value (NPV) and payback period. 14 The payback period was found to be 4.2 and 3.1 years for BAPV and BIPV systems, respectively. A building located in the temperate climate of Catania in Italy was renovated using BIPV systems 15 and a parametric study was carried out considering various types of PV systems, orientations, number of floors, and climates.…”
mentioning
confidence: 95%