2009
DOI: 10.14358/pers.75.9.1093
|View full text |Cite
|
Sign up to set email alerts
|

Error Budget of Lidar Systems and Quality Control of the Derived Data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
50
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 60 publications
(50 citation statements)
references
References 8 publications
0
50
0
Order By: Relevance
“…Lidar data errors originating from the instrument and the pulse's interaction with the measured surface are usually divided into random and systematic errors (Habib, Bang, Kersting, & Lee, 2009), with the random error more difficult to isolate and control. Within this analysis, site and instrument considerations limit the extent and influence of systematic error but the random error component is uncontrolled.…”
Section: Calculating Viewmentioning
confidence: 99%
See 1 more Smart Citation
“…Lidar data errors originating from the instrument and the pulse's interaction with the measured surface are usually divided into random and systematic errors (Habib, Bang, Kersting, & Lee, 2009), with the random error more difficult to isolate and control. Within this analysis, site and instrument considerations limit the extent and influence of systematic error but the random error component is uncontrolled.…”
Section: Calculating Viewmentioning
confidence: 99%
“…The actual horizontal error of the lidar and the GPS combined is likely to be greater than the vertical error but the development of a metric to measure and potentially correct this error are still in the formative stages (Habib et al, 2009). For two reasons, it is assumed that only the random error component of the horizontal accuracy will alter the accuracy of the IPVA° measure and this error would only be in limited areas of topographic obstruction.…”
Section: Calculating Viewmentioning
confidence: 99%
“…Initial review of a survey area is essential for effective survey planning using existing imagery or maps for a complete assessment (Habib et al, 2009), (Saylam, 2009). Local weather patterns, sudden topography changes, existing water basins, and general terrain cover may impact flight planning and should properly be examined prior to flight planning.…”
Section: Figure 4 Knowledge Exchange and Collaboration Among Differementioning
confidence: 99%
“…4 x 50 km 2 ) that should accommodate 20-30% overlapping to prevent loss of data in case of a system failure/reset and easier data processing/handling (Saylam, 2009), where good engines and software are essential for flight planning experts. All these equipment is provided by technical experts, who develop image processing oriented laser scanners (Schnadt and Katzenbeißer, 2004), simulation and data acquisition models (Habib et al, 2008), special targets and related models to improve accuracy and matching procedures (Zhi and Zhong, 2008), etc.…”
Section: Figure 4 Knowledge Exchange and Collaboration Among Differementioning
confidence: 99%
See 1 more Smart Citation