2017
DOI: 10.1016/j.proeng.2017.10.555
|View full text |Cite
|
Sign up to set email alerts
|

Errors, Defects and Safety Control at Construction Stage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
12
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 21 publications
(12 citation statements)
references
References 0 publications
0
12
0
Order By: Relevance
“…This statistical study illustrated that about 83% of the causes of damage were referred to bad execution practices starting from the eighties of the past century. Thus, there is an increasing demand for developing a better understanding of the effect of bad execution practices on the performance of concrete structures, especially on cracking in order to determine the proper method of repairing these defects [7][8][9].…”
Section: Introductionmentioning
confidence: 99%
“…This statistical study illustrated that about 83% of the causes of damage were referred to bad execution practices starting from the eighties of the past century. Thus, there is an increasing demand for developing a better understanding of the effect of bad execution practices on the performance of concrete structures, especially on cracking in order to determine the proper method of repairing these defects [7][8][9].…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, the widespread incidence of dimensional inconsistencies can be said to be a tolerance problem, which is not only design-related but also construction-related (Talebi et al, 2020). Baiburin (2017) for instance indicates that design errors account for only 4% of defects in construction. This aligns with the notion that dimensional inconsistency in construction elements, materials and components from nominal values or design specifications are among the most common and recurring defects in conventional construction (Talebi, 2019;Forcada et al, 2016;Jingmond and Agren, 2015).…”
Section: Compliance Of Stair Step Geometry With Recommended Standardsmentioning
confidence: 99%
“…DEs and rework cause complexity in the project [12]. Designers are responsible for 40% of errors on a construction project [13]. The reason Ref.…”
Section: Introductionmentioning
confidence: 99%