MassMin 2020: Proceedings of the Eighth International Conference &Amp; Exhibition on Mass Mining 2020
DOI: 10.36487/acg_repo/2063_37
|View full text |Cite
|
Sign up to set email alerts
|

Estimating cemented rock fill material properties for large-scale underground mining at Los Bronces

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Read & Stacey (2009) provide guidance on target confidence levels required for geotechnical models necessary for large open pit slope design for different project stages. Cepuritis & Villaescusa (2012) outline the data and design reliability required for open stope span design, as well as what design methods should be applied for different project stages. The suggested reliabilities are similar to those proposed by Read & Stacey (2009) and are as follows:…”
Section: Design Process and Level Of Effortmentioning
confidence: 99%
“…Read & Stacey (2009) provide guidance on target confidence levels required for geotechnical models necessary for large open pit slope design for different project stages. Cepuritis & Villaescusa (2012) outline the data and design reliability required for open stope span design, as well as what design methods should be applied for different project stages. The suggested reliabilities are similar to those proposed by Read & Stacey (2009) and are as follows:…”
Section: Design Process and Level Of Effortmentioning
confidence: 99%