2019
DOI: 10.1109/tits.2018.2873150
|View full text |Cite
|
Sign up to set email alerts
|

Estimating Phase Duration for SPaT Messages

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
29
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 26 publications
(29 citation statements)
references
References 16 publications
0
29
0
Order By: Relevance
“…This information is needed to compute the SPaT message. (The phase data itself can be obtained from the controller or its conflict monitor as in (Ibrahim et al, 2018).) Third, sensors must be installed at strategic locations along guideways upstream of conflict zones to detect whether a blind zone is occupied.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…This information is needed to compute the SPaT message. (The phase data itself can be obtained from the controller or its conflict monitor as in (Ibrahim et al, 2018).) Third, sensors must be installed at strategic locations along guideways upstream of conflict zones to detect whether a blind zone is occupied.…”
Section: Discussionmentioning
confidence: 99%
“…the signal phases faced by users at all legs) and an estimate of the time when the phase will change. (In an actuated signal phase durations are not deterministic, and must be estimated (Ibrahim et al, 2018).) We now see how SPaT information can help resolve conflicts.…”
Section: An I2v System For Intersection Safetymentioning
confidence: 99%
See 1 more Smart Citation
“…Historical data can be relevant for planning problems, like vehicle routing and reference velocity generation. Examples include traffic congestion on highways [41], and signal phase and timing data [53,54]; in both cases, historical data give deeper insight on traffic patterns, that is generally not found in maps.…”
Section: Cloud Infrastructurementioning
confidence: 99%
“…As seen in the earlier section, the beginning and ending of a phase can have different confidence values (Figure 4.8). Other studies have also emphasized that it might be worthwhile providing two estimates of the residual time (Ibrahim, 2019). Connected vehicle applications such as green light advisory and eco-driving require an accurate estimation of the traffic signal status for both BOG and EOG.…”
Section: Opportunities For Further Clarification Of Sae J2735mentioning
confidence: 99%