2024
DOI: 10.1049/pel2.12651
|View full text |Cite
|
Sign up to set email alerts
|

Estimating the potential maximum power point based on the calculation of short‐circuit current and open‐circuit voltage

Van Hien Bui,
Viet Anh Truong,
Vu Lan Nguyen
et al.

Abstract: This paper presents a technique to quickly determine the potential maximum power point (MPP) of a photovoltaic system using the duty cycle (D) of the DC/DC converter. The proposed method depends on estimating the open‐circuit voltage (Voc) and short‐circuit current (Isc) values under different operating conditions. It is an adapted version derived from the conventional Perturb and Observe (P&O) algorithm, designed to restrict the search area for the MPP. The working conditions, including temperature variat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2025
2025

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 34 publications
0
1
0
Order By: Relevance
“…The control algorithm based on the optimization model has a simple structure, is easy to implement, has favourable stability, and reaches the set value faster. However, such methods cannot guarantee that the system truly operates at the maximum power point, and the system cannot be tracked in real time, which causes power loss when the external environment changes 8 . Control algorithms based on disturbance self-optimization mainly include Perturbation and Observation (P&O) 9 , 10 , and the Incremental Conductance Algorithm (ICA) 11 , 12 .…”
Section: Introductionmentioning
confidence: 99%
“…The control algorithm based on the optimization model has a simple structure, is easy to implement, has favourable stability, and reaches the set value faster. However, such methods cannot guarantee that the system truly operates at the maximum power point, and the system cannot be tracked in real time, which causes power loss when the external environment changes 8 . Control algorithms based on disturbance self-optimization mainly include Perturbation and Observation (P&O) 9 , 10 , and the Incremental Conductance Algorithm (ICA) 11 , 12 .…”
Section: Introductionmentioning
confidence: 99%