Estimating time performance for building construction projects in Vietnam

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
24
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 32 publications
(24 citation statements)
references
References 38 publications
0
24
0
Order By: Relevance
“…The training states were developed used the Levenberg-Marquardt (LM) using the back-propagation algorithm comparing the output and the target of the analysis using the ANN. The performance illustrates the best fit value for the selected epoch value [7]. The Mean Square Error (MSE) shows the deviation of the predicted value from the real data.…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…The training states were developed used the Levenberg-Marquardt (LM) using the back-propagation algorithm comparing the output and the target of the analysis using the ANN. The performance illustrates the best fit value for the selected epoch value [7]. The Mean Square Error (MSE) shows the deviation of the predicted value from the real data.…”
Section: Resultsmentioning
confidence: 99%
“…The research demonstrated that the use of artificial intelligence in the field of construction engineering is far from ideal. Further research, as illustrated the neural networks provide a robust system that can be used as a complementary computational system to the conventional expert systems used for forecasting costs and project durations [7]. Jain et al introduce the aspect of neural networks as a prospective design and conceptual tool used to improve automation ideal in the engineering and construction industry.…”
Section: Related Workmentioning
confidence: 99%
See 2 more Smart Citations
“…Le-Hoai et al [14] applied multiple regression analysis techniques to integrate significant variables including subcontractor selection to predict project length. Park [15] investigated critical success factors for whole life performance assessment, placing the identified factors into a criteria matrix to aid decision making for selecting subcontractors at the bid stage.…”
Section: Introductionmentioning
confidence: 99%