2016
DOI: 10.17580/or.2016.06.09
|View full text |Cite
|
Sign up to set email alerts
|

Estimation of efficiency of hydrotransport pipelines polyurethane coating application in comparison with steel pipelines

Abstract: This is it! A small, lightweight, and extremely easy to use surface roughness measurement instrument that lets you view surface roughness waveforms right on the color LCD screen.• Registered design in Japan, China, and the European Union.• Design registration pending in the United States of America. The Surftest SJ-210 is a user-friendly surface roughness measurement instrument designed as a handheld tool that can be carried with you and used on-site. 平均線 2.4-inch color graphic LCD with backlightThe color LCD … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0
1

Year Published

2018
2018
2021
2021

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
3
0
1
Order By: Relevance
“…In the present study, SEC was calculated for transporting the highly-concentrated ( C w = 61.56%) coal–water slurry through a pipe bend ( r / D = 2.0) with and without the addition of an additive. The following relationships were used to determine SEC 12,22 …”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…In the present study, SEC was calculated for transporting the highly-concentrated ( C w = 61.56%) coal–water slurry through a pipe bend ( r / D = 2.0) with and without the addition of an additive. The following relationships were used to determine SEC 12,22 …”
Section: Resultsmentioning
confidence: 99%
“…Several researchers 813 have studied the head loss characteristics of the flow of different types of slurries in slurry pipelines using pilot plant test loops. Verma et al.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Результаты. Опытно-промышленная установка для проведения испытаний гидротранспорта была смонтирована работниками ПНС-I ЦХХ (рис.5) [2,9].…”
unclassified