2013
DOI: 10.7836/kses.2013.33.4.039
|View full text |Cite
|
Sign up to set email alerts
|

Estimation of minimum BESS capacity for regulating the output of wind farms considering power grid operating condition in Jeju Isalnd

Abstract: ( S u b mi td a t e:2 0 1 3 .5 .6 . ,J u d g me n td a t e:2 0 1 3 년 5 .1 3 . ,P u b l i c a t i o nd e c i d ed a t e:2 0 1 3 .8 .8 . )Abstract: Th i sp a p e rp r e s e n t st h ee s t i ma t i o no fmi n i mu m B E S Sc a p a c i t yf o rr e g u l a t i n gt h eo u t p u to fwi n df a r ms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Its rated voltage is 3.8V and rated capacity is 50Ah. The constants needed in modeling are drawn by actual discharge curve of the battery [2].…”
Section: Battery Modelingmentioning
confidence: 99%
See 1 more Smart Citation
“…Its rated voltage is 3.8V and rated capacity is 50Ah. The constants needed in modeling are drawn by actual discharge curve of the battery [2].…”
Section: Battery Modelingmentioning
confidence: 99%
“…But this system is often unstable because of the random variation of wind speed and the sun radiation. Therefore, a battery energy storage system (BESS) is implemented in this system [2]. The wind turbine system based on the squirrel cage induction generator (SCIG) consumes a lot of the reactive power [3].…”
Section: Introductionmentioning
confidence: 99%