Evaluasi Kinerja PLTMH Polohungo 40 KW Terhadap Small Scale Power Load (SSPL)

Abstract: The Polohungo Micro-hydro Power Plant (PLTMH) in Polohungo village, Tolangohula District, Gorontalo Regency has several components, namely intake, headrace, forebay, tailrace, penstock, turbines, mechanical equipment systems, mechanical transmission systems, and generators. The increase of demand for electrical power and the limited capacity of the generator was causing suboptimal plant operation. This study aims to evaluate the performance of the 40 kW PLTMH against the electrical load in Polohungo Village, G… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 1 publication
0
0
0
1
Order By: Relevance
“…Perlu adanya evaluasi dimulai dengan perhitungan data parameter teknis peralatan, yang kemudian dibandingkan dengan parameter yang diperoleh dari pengukuran. Hasil evaluasi PLTMH tidak beroperasi secara optimal saat menangani beban daya skala kecil, dimana jumlah daya yang dihasilkan dengan perhitungan teoritis lebih besar dari jumlah daya yang dihasilkan pada saat generator beroperasi [17].…”
Section: Pendahuluanunclassified
“…Perlu adanya evaluasi dimulai dengan perhitungan data parameter teknis peralatan, yang kemudian dibandingkan dengan parameter yang diperoleh dari pengukuran. Hasil evaluasi PLTMH tidak beroperasi secara optimal saat menangani beban daya skala kecil, dimana jumlah daya yang dihasilkan dengan perhitungan teoritis lebih besar dari jumlah daya yang dihasilkan pada saat generator beroperasi [17].…”
Section: Pendahuluanunclassified