2015
DOI: 10.1016/j.tranpol.2015.05.021
|View full text |Cite
|
Sign up to set email alerts
|

Evaluating the outcomes associated with an innovative change in a state-level transportation project prioritization process: A case study of Vermont

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 53 publications
(53 reference statements)
0
3
0
Order By: Relevance
“…Techniques recommended for prioritization in the literature are goal programming ( [61,62]), the process failure modes and effect analysis (PFMEA) [70], the Likert based criteria weightage method [31], the Monte-Carlo simulation-based data envelopment analysis method (DEA) [80], simulation-based models [81], and a resource-constrained DEA [15]. Qualitative methods are also recommended, such as the Delphi method or a decision tree method ( [71,82]), a fuzzy quality function deployment (QFD), and the DEA [66], a harmony search algorithm [95]. However, not all methods are applicable to all project situations.…”
Section: Prioritization and Balancingmentioning
confidence: 99%
“…Techniques recommended for prioritization in the literature are goal programming ( [61,62]), the process failure modes and effect analysis (PFMEA) [70], the Likert based criteria weightage method [31], the Monte-Carlo simulation-based data envelopment analysis method (DEA) [80], simulation-based models [81], and a resource-constrained DEA [15]. Qualitative methods are also recommended, such as the Delphi method or a decision tree method ( [71,82]), a fuzzy quality function deployment (QFD), and the DEA [66], a harmony search algorithm [95]. However, not all methods are applicable to all project situations.…”
Section: Prioritization and Balancingmentioning
confidence: 99%
“…In this study, the process of prioritizing projects before and after multi-criteria analysis for the state of Vermont in the USA was presented, and transportation projects were prioritized using a hybrid approach. Novak and his team developed their method considering criteria such as 1) clarifying the prioritization and project implementation process; 2) improving the project prioritization process by integrating objective evaluation criteria into the decision-making process; and 3) reducing inequities in budget allocation for transportation projects (Novak et al 2015).…”
Section: Introductionmentioning
confidence: 99%
“…Although these policies were designed to improve transportation investment decisions in the long run (see the Moving Ahead for Progress in the 21st Century Act), agencies across the country have recently been challenged to address the new federal standards while managing existing public demand and financial constraints. In asset management, these enhanced reporting and tracking requirements have increased the need for better maintenance prioritization systems (1).…”
mentioning
confidence: 99%