2021
DOI: 10.1061/(asce)co.1943-7862.0002107
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation Model for Influences of Driving Forces for Electronic Procurement Systems Application in Ghanaian Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 13 publications
(8 citation statements)
references
References 62 publications
0
8
0
Order By: Relevance
“…Obtaining an appropriate sample frame for this study was relatively difficult (Zhao et al ., 2014); hence, a traditional random sampling method cannot be utilized (Yevu et al ., 2021). Therefore calculating the study size based on statistical sampling techniques was not feasible.…”
Section: Methodsmentioning
confidence: 99%
“…Obtaining an appropriate sample frame for this study was relatively difficult (Zhao et al ., 2014); hence, a traditional random sampling method cannot be utilized (Yevu et al ., 2021). Therefore calculating the study size based on statistical sampling techniques was not feasible.…”
Section: Methodsmentioning
confidence: 99%
“…This study adopted a quantitative research approach via an international questionnaire survey to solicit responses from professionals in architectural, engineering, and construction (AEC) firms across the globe. It is adopted in this current study for it is grounded in a positivist methodological perspective (Hair et al, 2010), employed in assessing experts opinion and its offer of generalization (Yevu et al, 2021). Also, the study aims to evaluate BIM drivers between large firms and SMEs and between developing and developed countries, thus a questionnaire survey would provide a wider reach for the study.…”
Section: Methodsmentioning
confidence: 99%
“…The questionnaire survey method, which has been well-adopted in innovation and BIM studies was used for data collection (Babatunde et al , 2020; Ma et al , 2020). This method is adopted because it is beneficial in gauging experts’ opinion, experiences and provide quantifiability (Yevu et al , 2021). An empirical questionnaire survey was developed from a literature review of extant studies on BIM barriers and was face validated.…”
Section: Methodsmentioning
confidence: 99%