2016 IEEE Smart Energy Grid Engineering (SEGE) 2016
DOI: 10.1109/sege.2016.7589503
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of community virtual power plant under various pricing schemes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
4
2

Relationship

3
3

Authors

Journals

citations
Cited by 9 publications
(12 citation statements)
references
References 10 publications
0
12
0
Order By: Relevance
“…In Fig. 3, is the modified pricing scheme used by the VPP in this work [11], [13]. The modified pricing scheme was extended to 48 time intervals.…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…In Fig. 3, is the modified pricing scheme used by the VPP in this work [11], [13]. The modified pricing scheme was extended to 48 time intervals.…”
Section: Resultsmentioning
confidence: 99%
“…The modified pricing scheme was extended to 48 time intervals. It was considered to use the modified pricing scheme because its business incentives favors both the VPP and the prosumer [11], [13] while meeting the VPP objective. This is detailed in [11], [13].…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…The effective battery capacity of prosumer i, namely E ef f i , when E dis (i,t) > E rate (i) , can be expressed as follows [11,12]:…”
Section: Battery Modellingmentioning
confidence: 99%